By / Published June 18, 2009
SHAW AIR FORCE BASE, S.C. -- Master Sgt. James Eidson, 20th Medical Operations Squadron primary care NCOIC, checks on Master Sgt. Jeffrey Fricke, 20th Force Support Squadron product manager, during Team Shaw's operational readiness inspection, June 17. Fricke's simulated ailment was a heart attack. The ORI will evaluate the training and preparedness of Shaw Airmen for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)
SHAW AIR FORCE BASE, S.C. -- Airman 1st Class Tyrone De Belen, 20th Equipment Maintenance Squadron, dons his chemical protective gloves during Team Shaw's operational readiness inspection, June 17. The ORI will evaluate the training and preparedness of Shaw Airmen for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)
SHAW AIR FORCE BASE, S.C. -- Airman Justin King, 20th Component Maintenance Squadron, prepares a pod for its final check during Team Shaw's operational readiness inspection, June 17. The ORI will evaluate the training and preparedness of Shaw Airman for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)
SHAW AIR FORCE BASE, S.C. -- Airman Melshondra Hopkins, 20th Component Maintenance Squadron, torques the bolts on a combustion frame during Team Shaw's operational readiness inspection, June 17. The ORI will evaluate the training and preparedness of Shaw Airmen for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)
SHAW AIR FORCE BASE, S.C. -- Technical Sgt. Shawn Manning, 20th Component Maintenance Squadron, rebuilds a connector for a test bench cable during Team Shaw's operational readiness inspection, June 17. The ORI will evaluate the training and preparedness of Shaw Airmen for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)
SHAW AIR FORCE BASE, S.C. -- Technical Sgt. Paolo Ablang, 20th Aeromedical-Dental Squadron bioenvironmental engineer, calibrates his equipment for the next air sample to be tested for chemical contaminants during Team Shaw's operational readiness inspection, June 17. The ORI will evaluate the training and preparedness of Shaw Airmen for worldwide deployment. (U.S. Air Force photo/Senior Airman Kathrine McDowell)