Photos

Keyword: Category: Tag: Sort By:
A crew chief and logistics readiness fuel operator taxi a jet in and prepare it to be refueled, Shaw Air Force Base, S.C., May 9, 2013. The hot pits refueling process is practiced to prepare for fast-tempo refueling and to make sure pilots are able to take flight as soon as possible. (U.S. Air Force photo by Airman 1st Class Ashley L. Gardner/Released)


Heating up with hot pits

A crew chief and logistics readiness fuel operator taxi a jet in and prepare it to be refueled, Shaw Air Force Base, S.C., May 9, 2013. The hot pits refueling process is practiced to prepare for fast-tempo refueling and to make sure pilots are able to take flight as soon as possible. (U.S. Air Force photo by Airman 1st Class Ashley L. Gardner/Released)

Related Imagery
Airman st Class Ashley L. GardnerReleased
130509-F-VU971-001.JPG

DOWNLOAD PHOTO
(2.25 MB MB)



Tags
people



< Back to Main Gallery